In the vibrant landscape Qurtaba City, Ddevelopment work is ongoing throughout the entire project. Blocks A and B are in the final stages, where the sub-base laying work is ongoing. Similarly, the scenery of Blocks E and F is rapidly changing, with infrastructure nearing completion. In Blocks C and D, there is a significant amount of construction activity, with the pace of house building increasing. The work on street lights and street signboards in Blocks C and D has been completed. The attractive view of ready-to-live plots in Blocks J and K is drawing the attention of plot owners who are planning to build their dream homes. Rapid development is evident in Blocks L, M, N, and I, where the foundation for robust infrastructure is being laid. Drainage pipes are being installed in these blocks, and road construction is continuing without interruption, laying the groundwork for an integrated and interconnected community.